Mari Energies starts production at Spinwam-1, Waziristan Block
01-Apr-2026
MettisGlobal
April 01, 2026 (MLN): Mari Energies Limited (PSX:MARI)
has begun gas and condensate production from its Spinwam-1 discovery in the
Waziristan Block, KP Province, under the Extended Well Testing (EWT) phase.
The well, completed in the Lockhart reservoir, is currently
producing approximately 40 MMscfd of gas and ~200 BBL/D of condensate.
The addition of Spinwam-1 brings the early production
facilities at Shewa to full capacity, with combined output from both the Shewa
and Spinwam wells now reaching around 100 MMscfd of gas and 800 BBL/D of
condensate.
MariEnergies operates the Waziristan Block with a 55%
working interest, alongside joint venture partners Oil and Gas Development
Company Limited (OGDCL) and Orient Petroleum Inc., holding 35% and 10% working
interests, respectively.
The aforementioned was disseminated
through a notification to Exchange.
Copyright