The Islamabad Electric Supply Company (IESCO) has achieved 99% physical progress on its Advanced Metering Infrastructure (AMI) project by installing over 1.2 million smart meters across Rawalpindi City, Rawalpindi Cantonment, and Taxila Division.
The project, funded by a $160 million allocation from the Asian Development Bank (ADB), has significantly mitigated meter tampering and electricity theft. According to IESCO spokesman Raja Asim, the company's line losses have dropped to 7.6%, which is currently the lowest rate among all distribution companies (DISCOs) in Pakistan.
| Project Parameter | Value / Metric |
|---|---|
| Total Funding (ADB) | $160 Million (Allocated 2016, Signed 2022) |
| AMI Meters Installed | Over 1.2 Million |
| Current Line Losses | 7.6% (Lowest in Pakistan) |
| Physical Progress | 99% |
Investor Takeaway: Modernizing the distribution network through smart meters is a major step toward curbing line losses and power theft in Pakistan's energy sector. Successes like this are highly positive for structural reforms aimed at reducing the circular debt burden.
Read the full story on the original publisher’s website.
Open original article