In a historic move toward power sector deregulation, the government has announced the first wheeling auction of 400 megawatts (MW) of electricity under the Competitive Trading Bilateral Contracts Market (CTBCM). This framework will allow large industrial consumers (consisting of loads over 1MW) to buy power directly from IPPs/producers of their choice, bypassing traditional state-owned distribution companies.
The announcement and Request for Proposal (RFP) were published by the Independent System and Market Operator (Ismo), a subsidiary of the Power Division, with the submission deadline set for November 20, 2026.
Key Implementation Details
- Government Exit: Power Minister Awais Ahmad Khan Leghari stated that the government is practically exiting the power procurement business, transitioning the market from a single-buyer system to a competitive trading environment.
- Five-Year Auction Plan: The total wheeling quantum planned for auction over the next five years is 800MW, with 400MW offered in this initial phase.
- Capacity Ceilings: A single participant is restricted to a maximum aggregate allocation of 160MW (20% cap) over the five-year period, which can be sourced from one or multiple plants.
| Auction Parameter | Allocation / Limit Details |
|---|---|
| First Phase Offering | 400 MW |
| Total Five-Year Target | 800 MW |
| Maximum Capacity Limit per Participant | 160 MW (20% cap) |
| RFP Submission Deadline | November 20, 2026 |
Investor Takeaway: This structural shift will potentially ease circular debt pressure on the state and offer cheaper, deregulated power options for major listed manufacturing companies in textile, cement, and steel sectors, while reducing the long-term sovereign-backed off-take burden on future power generation projects.
Read the full story on the original publisher’s website.
Open original article