Attock Cement Pakistan Limited (PSX: ACPL) has announced that its board of directors has approved the installation of a 20 MWh Battery Storage System (BESS) alongside a dedicated 5 MW solar power setup at its plant site.
According to a notice sent to the Pakistan Stock Exchange (PSX), the approval was granted via a resolution by circulation in compliance with regulatory requirements. The initiative is designed to reduce reliance on peak grid electricity, optimize overall energy expenses, and expand the company's renewable energy footprint.
| Project Component | Capacity |
|---|---|
| Battery Storage Systems (BESS) | 20 MWh |
| Dedicated Solar Power Setup | 5 MW |
Investor Takeaway: Transitioning towards integrated green energy solutions helps insulate operations from high grid tariffs, ultimately supporting margin optimization and cost efficiency for ACPL.
Read the full story on the original publisher’s website.
Open original article