Oil and Gas Development Company Limited (OGDC), Pakistan's largest E&P firm, is facing infrastructure constraints that limit its ability to unlock the full potential of the Baragzai field. According to a briefing reported by Arif Habib Limited (AHL), additional drilling plans hinge on resolving facility bottlenecks at Lashari.
Management also highlighted the Rajian field's potential to supply 8,000–10,000 barrels per day. However, ramping up production requires technical arrangements with refineries to handle its heavy crude (11–12° API), with progress expected over the next 1 to 1.5 years.
| Field / Metric | Target / Capacity | Operational Context |
|---|---|---|
| Baragzai Field | Further Well Drilling | Requires expansion at Lashari facilities |
| Rajian Field | 8,000 - 10,000 bpd | Heavy crude (11-12° API); needs refinery setup |
| Annual CAPEX | > PKR 100 Billion | Targeted for next 2 years (variance ±25%) |
| FY27 Target Growth | 8% to 10% YoY | Maintained despite ~16% natural decline |
OGDC is also pursuing diversification into geothermal energy and lithium extraction, having found promising lithium concentrations at the Wahid Bakhsh-01 well. Separately, Turkish Petroleum has partnered with OGDC for offshore exploration, with seismic activity starting soon.
Read the full story on the original publisher’s website.
Open original article