Gul Ahmed Textile Mills (GATM): FY26 loss on energy costs, recovery expected over next two years

Chase
Stock ImpactPositive

Gul Ahmed Textile Mills Limited (GATM) - Corporate Briefing Notes

Research House: Chase Securities Pakistan | Date: 12 Nov 2026

Report Overview

Chase Securities has released corporate briefing notes on Gul Ahmed Textile Mills Limited (GATM). The company faced profitability challenges in FY26 due to high energy costs, but management remains optimistic about a turnaround over the next two years driven by contract repricing and renewable energy integration.

Company & Sector Snapshot

Sector: Textile Composite
Symbol: GATM (PSX)
Current Price: PKR 21.29
Market Capitalization: PKR 15.76bn
Shares: 740.06mn
Free Float: 185.01mn
52W High: PKR 33.90
52W Low: PKR 16.50

Financial Highlights & Performance

GATM reported a consolidated loss per share of PKR -0.46 in FY26 compared to an EPS of PKR 6.02 in FY25. Net sales declined 6% YoY to PKR 162.0bn, with gross margin settling at 15% (FY25: 19%). In 1QFY27, EPS recovered to PKR 0.86 vs PKR 0.41 in 1QFY26, and gross margin improved to 17% (1QFY26: 14%).

PKR mn (Consol.)FY25FY26YoY1QFY261QFY27YoY
Net sales172,931162,008−6%48,77741,144−16%
Gross profit31,99923,834−26%7,0446,880−2%
Operating profit14,5255,594−61%2,2151,891−15%
Profit after tax4,454−339n/m307640108%
EPS (PKR)6.02−0.46n/m0.410.86110%

Energy Costs & Power Mix

The company's power mix delivered electricity at an average cost of PKR 36/kWh in FY26, against a total power requirement of ~37 MW. Power mix breakdown: Captive gas 54%, Grid (KE) 27%, Solar 10%, Furnace oil 8%, and Diesel 1%.

Catalysts & Strategic Projects

  • Renewables Target: GATM aims to source ~40% of its power from renewables by FY28. Total capex for solar, wind, and BESS projects is planned at PKR 9.7bn, achieving 77.25 MW of combined renewable capacity (44 MW solar, 28.25 MW wind) and a 50 MWh battery energy storage system.
  • Nooriabad Relocation: Manufacturing facilities are moving to Nooriabad to utilize the wind corridor (expected capex of PKR 7.75bn for land and construction). Nooriabad 1 is expected by March 2027 and Nooriabad 2 by end-June 2027.
  • Margin Outlook: Gross margins are projected to converge to 18-20% as renewable benefits materialize.

Risks

Elevated energy and raw material prices remain key challenges, though management expects contracts to reprice and costs to be passed on over time.

Investor Takeaway

Despite a challenging FY26 resulting in a loss per share, ongoing renewable energy investments and operational relocations provide a constructive medium-term outlook.